QUARTZ FLOORING - QUARTZ 460
Liên hệQUARTZ KQ460
– Quotation includes VAT
– Prices above do not include installation costs
– Quotation includes VAT
– Prices above do not include installation costs
KOBLER is a pioneer brand in the market that applies high-grade quartz stone powder into the composition, contributing to enhancing the feng shui energy of the house while strengthening the solidity of the floor over time. Besides, KOBLER quartz floor is also applied advanced G-UV technology in Germany with a double coating process – Double Ultraviolet Lighting doubles the protection, maintains permanent color fastness, and is easy to clean along with Cool – Mixing technology against termites – mold – superior warping.
KOBLER quartz floor KQ460 structure includes 05 layers:
KOBLER QUARTZ FLOORS | |
Product Line | QUARTZ |
Product Code | KQ460 |
Size | 1220 x 146 x 7.5 |
Thickness | 6mm |
Premium IXPE underlayment | 1.5mm |
Anti-scratch coating | 0.5mm |
Full protection UV layer | UV x 3 |
Packing | 7 pieces/box |
Production technology | Germany |
Exclusive lock | European standard |
m2/Pack | 1.25m2 |
Piece/Pack | 7 |
Kg/Pack | 20,25 |
Certificate | ISO9001-2015, Floorscore, CE |
Warranty | 30 years |
Swelling degree | ≤ 0,1% |
Formaldehyde content | 0,00 mg (ISO 17226-1:2008) |
Abrasion | AC6 standard |
Size change when humidity changes | 0.01mm |
Cigarettes fireproof | Bfl-s1 ((evaluation of building materials with the best fire resistance according to European standards) |
Dimensional stability when heated | 0.05% |
Underlayment adhesion | 95N/50mm |
Durability when impacted | The floor is not broken under 20N |
Install Kobler Quartz Floor KQ460
Step 1 – Prepare tools and flooring materials: You need to prepare all the necessary tools to install quartz floors such as a rubber hammer, cutter, and ruler,…
Step 2 – Cleaning the floor surface: This is quite an important step, affecting the quality and durability of the floor after installation. You need to vacuum, clean and dry the floor surface.
Step 3 – Install quartz floor: Fix the first plank close to the wall, ensure accuracy, then install the next floor panels. During construction, use a hammer to gently tap the floor joints to fit closer together.
When laying a floor with the locking system, it is necessary to follow the following 2 stages:
Stage 1: Assembly
Bring the floor panel close to the edge of the wall and 5mm away from the edge of the wall
Cut the plank into 2/3 and 1/3, then install the newly cut 2/3 board right in the position of the second row to be installed.
In the third row, place 1/3 of the floorboard in the position to be constructed
Do this one after another until the project is completed
All floorboards will be connected by an advanced locking system. After the planks are in place, absolutely do not use a hammer to tap on the top of the floorboard because it may affect the quality.
Stage 2: Install skirting, reducer and T-molding
At the corner and base of the wall, install flooring accessories to complete the entire floor, bringing high aesthetic beauty to the project.
Reviews
There are no reviews yet.