KOBLER is a pioneer brand in the market that applies high-grade quartz stone powder into the composition, contributing to enhancing the feng shui energy of the house while strengthening the solidity of the floor over time. Besides, KOBLER quartz floor is also applied advanced G-UV technology in Germany with a double coating process – Double Ultraviolet Lighting doubles the protection, maintains permanent color fastness, and is easy to clean along with Cool – Mixing technology against termites – mold – superior warping.
KOBLER quartz floor KF460 structure includes 05 layers:
KOBLER QUARTZ FLOORS | |
Product Line | PRESIDNET |
Product Code | KF460 |
Size | 1220 x 146 x 7.5 |
Thickness | 6mm |
Premium IXPE underlayment | 1.5mm |
Sapphire coating | 10 layers |
Full protection UV layer | UV x 3 |
Packing | 9 pieces/box |
Production technology | Germany |
Exclusive lock | European standard |
m2/Pack | 0.99m2 |
Piece/Pack | 9 |
Kg/Pack | 20,25 |
Certificate | ISO9001-2015, Floorscore, CE |
Warranty | 30 years |
Swelling degree | ≤ 0,1% |
Formaldehyde content | 0,00 mg (ISO 17226-1:2008) |
Abrasion | AC6 standard |
Size change when humidity changes | 0.01mm |
Cigarettes fireproof | Bfl-s1 ((evaluation of building materials with the best fire resistance according to European standards) |
Dimensional stability when heated | 0.05% |
Underlayment adhesion | 95N/50mm |
Durability when impacted | The floor is not broken under 20N |
Install Kobler KF460 Quartz Floor
Step 1: Clean the floor surface before construction, creating an absolutely flat surface for the floor
Step 2: For floor surfaces with high convexity, it is necessary to use putty to flatten the surface
Step 3: Place the first-floor bar, bar A, at a 45-degree angle to the nearest wall edge
Step 4: Lay the next floor bars B and A alternately to form the first, 2nd, 3rd, and 4th rows.
Step 5: Cut straight at the lowest corner of the first row, then move the cut edge close to the wall, 5cm away from the wall.
Step 6: Complete the remaining rows. Note on the same row of alternating slices A and B
Step 7: Clean all construction dust on the floor surface and construction work is completed.
Preserving Quartz Floor KF460
How to preserve KF460 Quartz Floor, specifically:
Sweep the floor every day to remove dirt and impurities from the floor surface
Use a soft and clean rag to clean the floor regularly
Avoid spilling water on the floor and avoid applying too much force to the floor